Massage Ball SKU · ST1362614304 Featured

Massage Roller Ball With Handle

Stainless steel massage roller ball with handle for hot or cold therapy, featuring easy-glide bearings and temperature retention for up to 20 minutes.

Min. Order 1 pcs
Lead Time 25 days
Trade Terms EXW / FOB / CIF
Material
Quantity
1
Chat with sales on WhatsAppTypical reply within 30 minutes · Mon-Sat
Verified supplierFactory audited
OEM / ODM readyCustom logo & packaging
Global shippingSea / air / DDP options
Overview

Massage Roller Ball With Handle is a stainless steel massage roller designed for hot or cold use. Cold gel technology helps the roller hold temperature for up to 20 minutes.

Massage Roller Ball With Handle
Massage Roller Ball With Handle
Massage Roller Ball With Handle
Massage Roller Ball With Handle
Key Features
  • Holds temperature for up to 20 minutes.
  • Suitable for hot or cold therapy use.
  • Easy-glide bearings support smooth rolling.
  • Intended to soothe sore muscles, reduce inflammation, and alleviate pain.
  • Portable design with non-freezing alcohol-based liquid.
Product Details

For hot therapy, immerse the stainless steel roller in 50~70 Celsius water for about 5 minutes or more. For cold use, place the roller in a freezer for about 2 hours or more.

Specifications
Applications
Hot therapy, cold use, sore muscle soothing
Cold Use Preparation
Place in freezer for about 2 hours or more
Hot Use Preparation
Immerse in 50~70 Celsius water for about 5 minutes or more
Liquid Type
Non-freezing alcohol-based liquid
Material
Stainless steel
Rolling Mechanism
Easy-glide bearings
Temperature Retention
Up to 20 minutes
Temperature Technology
Cold gel technology

Payments & Shipping

Trade terms

EXW, FOB, CIF, DDU, DDP — choose the terms that match your sourcing flow.

Payment terms

T/T, Credit Card, D/P, L/C. Deposit 30%, balance 70% before shipment or against B/L copy.

Shipping time

Production lead time varies from 15 to 60 days depending on order quantity and customization.

Delivery method

Sea (15-45 days) is the most popular option. Air freight (3-10 days) and Train / Truck (7-15 days for nearby countries) are available.