Push Up Bar / Board SKU · ST2261274564 Featured

Push up Bar

Pair of heavy-duty push-up/parallette bars with thick-gauge square pipe metal construction, 500 lb support, non-slip 12 in bases, grip tapes, and included Allen wrench for assembly.

Min. Order 1 pcs
Lead Time 25 days
Trade Terms EXW / FOB / CIF
Material
Quantity
1
Chat with sales on WhatsAppTypical reply within 30 minutes · Mon-Sat
Verified supplierFactory audited
OEM / ODM readyCustom logo & packaging
Global shippingSea / air / DDP options
Overview

Push Up Bar set designed for home calisthenics, strength training, muscle-building, and balance training. The pair of parallel bars uses thick-gauge square pipe metal construction with connected parts described as firm, strong, and heavy duty.

Push up Bar
Push up Bar
Push up Bar
Push up Bar
Key Features
  • Supports up to 500 lbs
  • 12 inch wide square pipe standing base for stability
  • Bottom non-slip mat helps prevent movement on smooth floors
  • 1.3 inch diameter bars suitable for men and women to hold
  • 10 inch height provides room for L-sits, dips, and handstands
  • Includes two color grip tapes for comfortable holding
  • No extra tools needed; included Allen wrench is used for assembly
Product Details

Suitable for beginners, intermediates, and advanced users for upper-body exercise. Intended uses include push-ups, dips, handstands, planches, L-sits, and parallel bar exercises targeting the back, chest, shoulders, abs, triceps, and legs.

Specifications
Assembly
No extra tools needed; Allen wrench included
Bar Diameter
1.3 in
Base Feature
Non-slip mat on bottom
Base Width
12 in
Exercises
L-sits, dips, handstands, planches, push-ups, parallel bar exercises
Grip
Two color grip tapes
Height
10 in
Material
Thick-gauge square pipe metal
Set Includes
1 pair parallel bars
Target Muscles
Back, chest, shoulders, abs, triceps, legs
Training Use
Calisthenics, gymnastics, strength training, muscle-building, balance training
Weight Capacity
500 lbs

Payments & Shipping

Trade terms

EXW, FOB, CIF, DDU, DDP — choose the terms that match your sourcing flow.

Payment terms

T/T, Credit Card, D/P, L/C. Deposit 30%, balance 70% before shipment or against B/L copy.

Shipping time

Production lead time varies from 15 to 60 days depending on order quantity and customization.

Delivery method

Sea (15-45 days) is the most popular option. Air freight (3-10 days) and Train / Truck (7-15 days for nearby countries) are available.