Grip plate SKU · ST1634868045 Featured

Olympic Barbell Plates

Olympic barbell plates with a solid iron core, rubber surface, steel ring insert, and three grip holes for weightlifting and strength, balance, and flexibility training.

Min. Order 1 pcs
Lead Time 25 days
Trade Terms EXW / FOB / CIF
Material
Quantity
1
Chat with sales on WhatsAppTypical reply within 30 minutes · Mon-Sat
Verified supplierFactory audited
OEM / ODM readyCustom logo & packaging
Global shippingSea / air / DDP options
Overview

Olympic Barbell Plates are designed for barbell use and single-plate exercises. They feature a solid iron core, rubber surface, steel ring insert, and three grip holes for handling.

Olympic Barbell Plates
Olympic Barbell Plates
Olympic Barbell Plates
Olympic Barbell Plates
Key Features
  • Solid iron core with rubber surface to help protect floors during exercise
  • Steel ring insert supports easier barbell assembly
  • Three grip holes are designed for hand placement and single-plate weightlifting exercises
  • Intended for weightlifting, strength training, balance training, and physical flexibility training
  • Durable and sturdy rubber weight plate construction with a comfortable grip
Product Details

These weight plates are suitable for men and women and are intended to help build muscle and body strength. The design supports dropping and lowering after lifting exercises, according to the source description.

Specifications
Core Material
Solid iron
Features
Comfortable grip; designed for barbell assembly and single-plate exercises
Grip Holes
Three
Insert Material
Steel ring insert
Surface Material
Rubber
Training Use
Weightlifting, strength training, balance training, physical flexibility training
User Group
Men and women

Payments & Shipping

Trade terms

EXW, FOB, CIF, DDU, DDP — choose the terms that match your sourcing flow.

Payment terms

T/T, Credit Card, D/P, L/C. Deposit 30%, balance 70% before shipment or against B/L copy.

Shipping time

Production lead time varies from 15 to 60 days depending on order quantity and customization.

Delivery method

Sea (15-45 days) is the most popular option. Air freight (3-10 days) and Train / Truck (7-15 days for nearby countries) are available.